What is HSG264?
HSG264 – Asbestos: The Survey Guide is the Health and Safety Executive's (HSE) recognised guidance document for carrying out asbestos surveys. It sets out the standards expected of asbestos surveyors and provides guidance on planning, undertaking and reporting asbestos surveys to ensure asbestos-containing materials (ACMs) are correctly identified and managed.
At Strata Asbestos Consultancy, every asbestos refurbishment survey is planned and undertaken in accordance with the principles contained within HSG264, ensuring our clients receive accurate, reliable and practical information to support their refurbishment project.
Whilst HSG264 itself is guidance rather than legislation, it is widely recognised as the industry benchmark for asbestos surveying and supports compliance with the Control of Asbestos Regulations 2012 (CAR 2012).
Why is HSG264 Important?
The primary objective of HSG264 is to ensure asbestos surveys are suitable, sufficient and fit for purpose.
A refurbishment survey that does not follow recognised guidance may fail to identify hidden asbestos-containing materials, potentially placing contractors, building occupants and others at risk of exposure when refurbishment works begin.
By following HSG264, surveys are designed to:
- Locate asbestos-containing materials before refurbishment works commence.
- Identify concealed asbestos that cannot be seen during normal occupation.
- Provide reliable information for contractors planning refurbishment works.
- Reduce the likelihood of unexpected asbestos discoveries during construction.
- Support compliance with the Control of Asbestos Regulations 2012.
- Protect workers from accidental exposure to airborne asbestos fibres.
Ultimately, a thorough survey undertaken in accordance with HSG264 helps minimise delays, control project costs and improve health and safety throughout the refurbishment process.
Refurbishment Surveys Must Be Planned Around the Proposed Works:
One of the key principles of HSG264 is that every refurbishment survey should be specifically designed around the scope of the proposed refurbishment works.
No two refurbishment projects are identical.
Replacing a domestic kitchen requires a different level of inspection compared with refurbishing a school, converting offices or upgrading an industrial facility.
Before undertaking a survey, our surveyors establish:
- Which areas will be refurbished.
- Which building elements will be disturbed.
- The level of intrusive inspection required.
- Safe methods of access.
- Any restrictions affecting the inspection.
- Areas that cannot be accessed safely.
This ensures the survey is proportionate to the proposed works while still providing contractors with the information they need to work safely.
Intrusive Inspection is Essential:
Unlike a Management Survey, HSG264 recognises that refurbishment surveys require intrusive inspection techniques to identify asbestos hidden within the building structure.
Depending on the proposed refurbishment works, this may include accessing:
- Ceiling voids
- Floor voids
- Wall cavities
- Pipe boxing
- Service risers
- Ductwork
- Roof voids
- Structural encasements
- Lift shafts
- Plant rooms
- Beneath floor finishes
- Behind fixed furniture
Controlled inspection damage is often unavoidable and forms an essential part of a suitable refurbishment survey. The extent of any intrusive inspection is agreed with the client before work begins and is limited to the areas affected by the proposed refurbishment.
Representative Sampling and Laboratory Analysis:
HSG264 emphasises that suspected asbestos-containing materials should not be identified by appearance alone.
Representative samples should be carefully obtained and analysed by a UKAS-accredited laboratory using recognised analytical methods.
Where sampling cannot be undertaken safely, or access is not possible, HSG264 recommends that materials should be presumed to contain asbestos until proven otherwise.
This cautious approach helps ensure that refurbishment work can be planned safely, even where complete access is not immediately achievable.
Survey Limitations and Exclusions:
Another important principle of HSG264 is recognising that every survey has limitations.
Some areas may remain inaccessible due to:
- Structural safety concerns.
- Live electrical equipment.
- Confined spaces.
- Occupancy restrictions.
- Operational plant and machinery.
- Client-imposed limitations.
- Restricted access.
Where access cannot be obtained, these limitations are clearly documented within the survey report together with recommendations for further investigation where appropriate.
Providing transparent information about any limitations enables clients and contractors to make informed decisions before refurbishment work proceeds.
Experience Makes the Difference:
Although HSG264 provides the framework for asbestos surveying, the quality of a refurbishment survey ultimately depends on the competence and experience of the surveyor carrying it out.
With over 20 years of practical asbestos industry experience, Strata Asbestos Consultancy has undertaken refurbishment surveys within domestic properties, commercial buildings, schools, healthcare facilities, industrial sites, manufacturing plants, hotels, public buildings and complex operational environments.
Our surveyors understand how buildings have evolved through extensions, alterations and previous refurbishment works, allowing us to identify hidden asbestos risks that may otherwise remain undetected.
Every refurbishment survey is approached with the same objective—to provide accurate, reliable and practical information that enables refurbishment works to proceed safely, efficiently and in compliance with current asbestos legislation.